Home builder · La Trinidad, Benguet

Homes built right for Benguet.

New builds, renovations, repairs and unfinished projects in Baguio, La Trinidad and nearby towns. One crew from foundation to roof, with more than 15 years on site.

DESIGNED FOR THE SLOPE RETAINING WALL STEPPED FOOTING CANAL RUNOFF
15+years building and repairing homes
8trades on one crew, foundation to roof
6towns served around Baguio
4languages: English, Tagalog, Ilocano, Kankanaey

What we do

From a new house to a project someone else left unfinished.

New homes

Design and build on your lot, from soil check and permits to turnover.

Renovations and extensions

Added rooms, second floors, new kitchens and baths, done around your family.

Repairs

Roof leaks, wall cracks, waterproofing, and electrical and plumbing fixes.

Unfinished projects

We inspect the existing work first, fix what needs fixing, then finish it.

One crew, every trade

  • Structural
  • Masonry
  • Carpentry
  • Plumbing
  • Electrical
  • Welding
  • Painting
  • Roofing

Fewer handoffs between subcontractors means fewer gaps, fewer delays and one team answerable for the whole job. Our electrical team brings over 15 years of electrical engineering work.

Built for Benguet

Slopes, heavy rain and cold nights shape how a house should be built here.

Slopes

Soil checked before design. Footings stepped with the land, retaining walls and drainage planned together.

Rain

Water is the main enemy of a mountain house. We plan where every drop goes, from the roof to the road.

Cold and damp

Waterproofing, ventilation and the right finishes keep walls dry and rooms comfortable all year.

Your language

We explain plans, quotes and problems in English, Tagalog, Ilocano or Kankanaey, whichever you prefer.

How we work

Clear steps, so you always know what you are paying for.

  1. Free consultation

    We visit your lot or review your plan and talk budget honestly, whether or not you hire us.

  2. Itemized quote

    Every material and job listed, with specs and what is not included. No lump sums.

  3. Plans and permits

    Plans signed and sealed by licensed professionals, filed with your municipal Building Official.

  4. Build in stages

    A written contract, and payments tied to finished stages: foundation, structure, roof, finishes.

  5. Turnover

    We walk the house with you and fix punch-list items before the last payment.

You have good machineries and an industrious working force that made my roofing construction done in just a few days in spite of the rains. Thank you so much.

Roofing client, Benguet · message to our Facebook page, 2023

Where we work

Based in Buyagan, La Trinidad. Working across the Baguio area.

Close enough to visit your site the same week, and to be there when the work needs us.

  • Baguio City
  • La Trinidad
  • Itogon
  • Tuba
  • Tublay
  • Sablan

Construction tips

Read before you build.

All articles →

Free estimate

Tell us about your project.

Fill this in and choose how to send it: Messenger, text or email. We reply with next steps and a time to visit your lot or review your plan.

Call or text
+63 918 761 5290
Office
AD 13-A Buyagan Poblacion, La Trinidad
What do you need?